FS40-35 Backhoe Loader (Busy at Both Ends)
Standard configuration: front shovel with bucket, rear excavator with digging bucket, luxury interior driving cabin, fan, luxury adjustable rotating seat, adjustable dashboard, hydraulic pilot operation, Yunnei power engine (can be equipped with Yuchai or Dongfeng Cummins engine), 14-17.5 vacuum front tires, 19.5L-24 vacuum rear tires, special 280 gearbox, Feicheng Yunyu steering bridge, A-shaped legs.
Category:
Key words:
Product Details
FS40-35Technical Parameters |
|
Overall Operating Weight |
8000KG |
Transport DimensionTransport Dimension |
|
Length × Width × Height mm L*W*H |
7600×2260×2940mm |
Wheel Base |
2250mm |
Min. Ground Clearance |
300mm |
Bucket Capacity |
1.3m3 |
Breakout Force |
38KN |
Loading Lifting Capacity |
2800KG |
Bucket Dumping Height |
2800mm |
Bucket Dumping Distance |
1062mm |
Digging Depth |
52mm |
Backhoe Capacity(Width) |
0.35m3(620mm) |
Max. Digging Depth |
4100mm |
Optional Digging Depth |
4000mm |
Swing Angle of Backhoe |
190o |
Max. Pulling Force |
39KN |
EngineEngine |
|
Model |
YUNNEI 38GBZ |
Type |
In Line, Direct injection, Four-Stroke, Water Cooling |
Rated Power |
76KW |
Steering SystemSteering System |
|
Steering Angle |
±36 o |
Min. Turning Radius |
6581mm |
Pressure of the System |
12Mpa |
AxleAxle |
|
Brand |
Feicheng Yunyu Steering Bridge FEICHENG YUNYU |
Main Transmission Type |
Double Reduction |
Final Reducer |
Single Stage Final Reducer |
Rated Loader of Axle |
4/18.5t |
Transmission SystemTransmission System |
|
Torque Converter |
|
Model |
YJ280 |
Type |
Single-stage Three Elements |
Cooling Method |
Oil-cooling Pressure Circulation |
Gearbox |
|
Type |
Fixed Shaft Power Transmission |
Gears |
Two Gears Ahead, Two Gears Astern |
Max. Speed |
30Km/h |
TyreTyre |
|
Specification |
(F) 14-17.5 Front Wheel |
Pressure of Front Wheel |
0.22 Mpa |
Pressure of Back Wheel |
0.22 Mpa |
Brake System |
|
Service Brake |
Air Over Oil Caliper Brake |
External Type |
|
Self-regulation |
|
Self-balance |
|
Emergency Brake |
Operation Power Implementing Brake |
Manual Operation Power Terminating Brake |
|
Hydraulic SystemHydraulic System |
|
Pressure of Hydraulic System |
22Mpa |
Digging Power of Excavator Grab |
46.5KN |
Dipper Digging Force |
31KN |
Dipper Lifting Time |
5.4S |
Dipper Lowering Time |
3.1S |
Dipper Discharge Time |
2.0S |
Standard Configuration |
Front shovel with bucket, rear excavator with digging bucket, luxury interior cab, fan, luxury adjustable rotating seat, adjustable instrument panel, hydraulic pilot operation, Yunnei Power engine (optional Yuchai, Dongfeng Cummins engines), 14-17.5 vacuum front tires, 19.5L-24 vacuum rear tires, special 280 gearbox, Feicheng Yunyu steering bridge, A-shaped legs. |
Note: The above parameters or configurations are subject to change without notice. |
recommend products
Online message
Note: Please leave your email address and our professionals will contact you as soon as possible!